We love seeing the city grow and develop sustainably. We are here to help you with your planning permit every step of the way. If you've done this before, jump straight in.
Wait, is this a subdivision application?
If it is then you are in the wrong place my friend - subdivision applications are processed through SPEAR and can only be lodged by a registered Land Surveyor. So jump on the SPEAR website to do this.
Are you looking for the VicSmart application?
Go to our Vicsmart permit application to lodge or gain information on the requirements.
Application fees
What you need to apply
- Copy of Title and Plan of Subdivision (produced within the last 3 months)
- Copy of any Covenants or Section 173 Agreements registered on Title if any (under ‘Encumbrances')
- Scaled and dimensioned drawings including:
- existing conditions plan
- demolition plan; if any
- proposed site, floor and roof plans, and elevations
- Water Sensitive Urban Design (WSUD) plan
- shadow plans (where there is a residential use or existing solar panels on an adjacent lots)
- landscape plan (if applicable)
- feature survey plan
- materials and colour schedule
- if it’s a ‘ResCode’ application, Neighbourhood and Site Description and Design Response Plan
- The Metropolitan Planning Certificate is required if the cost of development is more than the threshold $1,207,000
- Written submissions:
- Planning report responding to the Brimbank Planning Scheme (e.g. as required by the Zone & ResCode)
- Environmentally Sustainable Design reports (as required by C. 22.02)
- Green Travel Plan (if required by the schedules to clause 45)
- Other documentation i.e. Traffic report, Arborists report, Cultural Heritage Management Plan (CHMP)
- A credit card to make the payment
This form takes about 15 minutes to complete.